{"id":932,"date":"2021-01-10T23:50:00","date_gmt":"2021-01-10T22:50:00","guid":{"rendered":"https:\/\/carimedia.eurofiliales.com\/?p=932"},"modified":"2022-02-02T21:23:41","modified_gmt":"2022-02-02T20:23:41","slug":"remise-en-etat-dun-train-dinjection","status":"publish","type":"post","link":"https:\/\/www.eurofiliales.com\/en\/remise-en-etat-dun-train-dinjection\/","title":{"rendered":"Refurbishment of injection train"},"content":{"rendered":"
A large-scale project that was carried out by our teams OG3S and Eurofiliales in less than 3 months and that included :<\/p>
- Complete overhaul of a BB5 water injection pump,<\/p>
- Complete overhaul of a 1 stage increaser, API 613, input speed of 1780 rpm to an output speed of 3877 rpm,<\/p>
- Refurbishment of the pump, gearbox and electric motor skid's feet by chemical resin coating<\/p>
- Installation of each unit on the skid<\/p>
- Installation and connection of auxiliary equipment<\/p>
- Line up of the pump\/gearbox\/motor train<\/p>
- Commissioning of the unit and monitoring of the operating parameters<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t